http://www.flyinphilsphotos.com/amuse/nj/sfga/eltc-bbnpc/2006-03-26/album0
these pics are great... and you can move the photo around to get better views....
also i came a across a new video of the ride animation which gives even more views than the original animation check it out here:
Just when that "opening day" is, is anyones guess.
*** Edited 3/28/2006 8:40:54 PM UTC by Rctycoon2k***
Shaun Rajewski
Founder, Lead Developer
Epic Web Studios, LLC
That drop does look mmm mmm good though.
Seriously, though, for me this season is about Voyage, Rumbler, and Toro...I honestly don't care much at all about ANY of the new steel (and yes, that includes the new #1 steel coaster, Tatsu)... :)
edit: thrillerman1, the reason Toro is taking a long time to build is because the cranes need to move AROUND the existing structure of Rotting Timber...plus they'd really like to END the project with the cranes OUTSIDE of the structure, so as not to paint themselves into a corner...so to speak... ;)
Oh, and the P-n-P part has to do with how the running plate attaches to the structures, it's really only *replacing* the 2x6 ledger boards, so time savings is virtually non-existent...
Hope that helps! :) *** Edited 3/28/2006 9:03:12 PM UTC by rollergator***
You must be logged in to post