"We must let go of the life we have planned, so as to accept the one that is waiting for us."
-Joseph Campbell
1st train will be auctioned off for juvenile diabetes foundation and rides afterward will be $4.50 with $3.50 going to the charity. If you feel so inclined the article is on goerie.com *** Edited 3/22/2008 8:41:02 PM UTC by rsscbell***
I didn't realize the whole bridge was covered, interesting. Is it all netting?
The ride will open to the public included with Ride-a-Rama on the 20th (as the 19th they are closed to the public [Monday]).
As for photos, the official gallery was updated too
Shaun Rajewski
Founder, Lead Developer
Epic Web Studios, LLC
To add to my excitment, personally, I can't wait to actually wait in line at Waldameer. It's been far too long where I've watched ride operators wait for riders, or have I actually seen rides at Waldameer run at full capacity on a consistent basis.
Shaun Rajewski
Founder, Lead Developer
Epic Web Studios, LLC
Tom
You have disturbed the forbidden temple, now-you-will-pay!!!
Tom
You have disturbed the forbidden temple, now-you-will-pay!!!
Tom
*** Edited 4/10/2008 6:41:36 PM UTC by LdScotsman***
You have disturbed the forbidden temple, now-you-will-pay!!!
Sorry to break your record of repeat posts ;).
Shaun Rajewski
Founder, Lead Developer
Epic Web Studios, LLC
Tom
You have disturbed the forbidden temple, now-you-will-pay!!!
But, with better news, trackwork is almost done, all the ride needs is the track steel in the station and on the very top of the turn around hill, everything else is done.
46 new photos added to the construction album.
Beat ya, ;).
Shaun Rajewski
Founder, Lead Developer
Epic Web Studios, LLC
Either way I'm spending $50 1st ride or not.
Coaster Junkie from NH
I drive in & out of Boston, so I ride coasters to relax!
You must be logged in to post