-----------------
The worst day at Cedar Point is better than the best day at work.
-----------------
1989, 9 years old bawling my eyes out because I didn't want to ride Magnum. I did anyway and look at me now. Why did ya make me do it Dave? ;)
-----------------
What would we all do if roller coasters became non-existent???
From looking at the tower first hand, I think that it will hold more than one section of track, possibly the tophat looking element on the front and an overbanked turn on the back.
Remember, the ride is gonna be tall. It must have strong supports to counteract those Lake Erie winds. From talking to my contacts at the park, all I can say is VROOOM... VROOOM....VROOOM ;)
-----------------
I hear a train a comin'
Comin' round the bend :P
TR2k3....GET READY!
ooooo.....another troll rears his head.
MagnumForce isn't the only one who believes there will be a tophat. There are a lot of CP regulars (such as MagnumForce) who may not have specifics, but enough information to make this a very valid possibility. Remember, this coaster is going to be twice as high as Xcelerator, so the major support for the element will be much larger.
Check out thw construction webcam on CP's site. The tower currently being built is huge, and they are still adding to it.
-----------------
I'd rather die living than live like I'm dead
Look at the support structure itself, and forget pictures I have saw it up close and personal a couple of times.
I am 100 percent sure that the top hat will go up that tower and down it. On the 2 outside legs of the tower are places for track to be attached. Footers lead up to the tower end and then go away from it in nice parrallel lines. Look at the tower now on the webcam, two identical sets of outward facing braces. Wow that couldn't be pull ups and pull outs could they? Of course they are.
It's not a hunch, it's not a feeling. It is what is gotten from putting two and two together and examining the evidence.
To me it is much more then a possibility, it is a certainty. the top hat is definitely going on that tower.
Believe Me ;)
And I don't need to be screamed at by some troll thank you very much.
-----------------
All I need is 4.5 million bucks and a half a mile long sliver of land and maybe someone could build me my very own Shivering Timbers. ;)
Hey, I'm with ya, CP. Those supports look nothing like Xcelerator (the coaster that is making this one possible).
If there is evidence of anything more I'd like to see it...just post here.
Kraxel, the tower is already a good 200 feet tall and is showing no signs of getting any narrower at the top. Xcelerator is 205 feet, I would say what was there now is either at that mark or over it.
It may not be twice as tall (I belive with everything that has been put out there and from what I have deduced myself it will be) but it will be considerably taller.
-----------------
All I need is 4.5 million bucks and a half a mile long sliver of land and maybe someone could build me my very own Shivering Timbers. ;)
Sorry, man. You're wrong. A member of my family was at CP yesterday. (Yes, the park is closed. They weren't there to ride.) They had to pass the construction area to get where they were going (not related to the new coaster) and witnessed the latest addition to the tower as it was being erected. It's right up there around 200. They kept on saying to me exactly what MagnumForce said, about it being taller than Xcellerator's tophat and not showing signs of stopping yet.
-----------------
- Peabody
*** This post was edited by Peabody on 9/27/2002. ***
-----------------
www.geocities.com/thrillworldonline
VISIT IT!
-----------------
Jes
Jes's Roller Coasters DJ Jes
Six Flags Worlds Of Adventure 2002 Ride-Ops Crew (Have Fun Trying To Find Me!)
-----------------
MLEM4S rules
-----------------
I hear a train a comin'
Comin' round the bend :P
TR2k3....GET READY!
You are right kRaXLeRiDah, they have not yet made an announcement with the actual height. They've only commented about their "monster".
But at least two people on these boards who I know personally, both of whom have good relations with Cedar Fair park higher ups, have confirmed the coaster is over 400'. You believe what you want to.
-----------------
I'd rather die living than live like I'm dead
One think you should remember is that Xcelerator's vertical construction didn't happen till march. They completed it near the end of april, less that two months from start to finish.
Cedar Point has to have this coaster operating by may, or in 7 months. I assume they will need to have up to 2 months for tweaking, and a bit longer to get the coaster from completed construction to operation. This leaves them with about 5 mothst to build the coaster from now. Since the supports are simpler than Millennium Force's, everything will go quicker. Now you can factor in the weather, and there headway on the tower, and your almost guaranteed a fully operational coaster opening day.
For the height, just the size of the pullout is a sign, not to mention that there is almost three times as much permanent brake track than Xcelerator.
It's going to be very tall, very fast, and very hard to beat.
You must be logged in to post