Hobbes: "What's the point of attaching a number to everything you do?"
Calvin: "If your numbers go up, it means you're having more fun."
ApolloAndy said:
I've waited 4 hrs. multiple times for KK, not because I wanted to, but because it broke when I was "right there" and I felt really stupid leaving when I'd already invested an hr and a half. In fact, this last weekend, I was on the launch track and got rolled back into the station backwards and then had to wait 2 more hrs. for the rear switch track to get fixed.
Which day was that this past weekend ? I rode KK twice by 12:00 on Saturday. Later on in the afternoon, I came back for the Wild Safari and didn't see any KK launches for quite a long time. Was the problem on Saturday afternoon ?
I would have to say in a line, probably two and half hours, for millenium force at night opening year. Also the same for TTD second week it was open.
The new coasters this year, ie hydra and Italian job without problems have been mere walk-ons so i would say wait time is down, or what rides outside of Ka are getting some rediculous waits?
Resident Arrow Dynamics Whore
Hobbes: "What's the point of attaching a number to everything you do?"
Calvin: "If your numbers go up, it means you're having more fun."
ApolloAndy said:
Yeah. It was Sat. I was on 2nd public train in front, then waited an hr. Then on my third go around, I was seated in the train by 1:15pm but they had to wheel us back in. Didn't get to ride until about 3:30.
Bummer. At least you got 3 rides on the thing. My brother and I went and got our first ride within 1/2 hour. We got a 2nd ride while the line wasn't terribly long. We managed to get both rides in by 12:00. At that point, the line looked to be at least 2 and 1/2 hours. So, we moved on to other rides.
3 hours for Mean Streak in 1991
2 hours and 45 minutes for Batman The Ride (SFGAM)
2 hours and 45 mintutes for Raptor
2 hours and 30 minutes for Magnum XL 200 (1st year)
2 hours and 15 minutes for M-Force
2 hours for Funnel of Fear at MA (recent 8/7/05)
2 hours for Mantis at Cedar Point (1st year)
1 hour 45 minutes for X-flight at (Geauga Lake)
Yes, it's true, and I think the year was 1977. I was 9 years old.
I have waited for longer times, due to rain or breakdowns, but believe this was the longest due to a line.
Now-a-days, even if it is cold at Great adventure (Like it was opening day in March this year), and there's little or no line - I go on it. Just to retaliate for that first time.
Here's To Shorter Lines & Longer Trip Reports!
ApolloAndy said:
Yeah. It was Sat. I was on 2nd public train in front, then waited an hr. Then on my third go around, I was seated in the train by 1:15pm but they had to wheel us back in. Didn't get to ride until about 3:30.
Ouch...sounds like KK still has problems.
4½ hours for MF
1½ hours for Italian Job at PCW
2 Hours for TopGun at PCW
1½ Hour for BAT at pcw (BOOMERANG) <-- i was nuts
2½ Hours for Mantis at CP
3 Hours for Superman Ride of Steel at SFDL
2½ HOURS for Nightmare at Phantoms Cave - SFDL
75 MINS. Wicked Twister
I can pretty much handle the long lines as long as the ride is worth it and it's shaded if it's hot out.
You must be logged in to post