I stand corrected. Incredible turnaround.
SFoGswim said:
I give [a Saturday opening] about a 0% chance of happening. I say June 1st is the earliest possible.
Bolliger/Mabillard for President in '08 NOT Dinn/Summers
It looks like there might be a slight pop of air on there too.
884 Coasters, 34 States, 7 Countries
http://www.rollercoasterfreak.com My YouTube
....and then whaala! There it is. Joy!
Now let's hope the ride is just as sweet.
Touchdown said:
Correct me if Im wrong but I thought I read somewhere that the state of Ohio requires a minimum of two weeks of testing before the ride is allowed to open. Since its been modified the old ride testing doesnt count for those two weeks, so that means that Memorial day is out the window and the ride should open late in the first week of June in time for the 9th/10th weekend.
So much for that theory guy;) Now we can only hope that the thing runs for more than 15 minutes a day. *** Edited 5/25/2007 6:02:42 PM UTC by Superstew***
o yea the s-curve..well every ride cant be perfect...
884 Coasters, 34 States, 7 Countries
http://www.rollercoasterfreak.com My YouTube
884 Coasters, 34 States, 7 Countries
http://www.rollercoasterfreak.com My YouTube
The ride is a winner, hands down, and judging by all of the smiles and screams with every train that comes back, the public seems to agree.
Jeff - Editor - CoasterBuzz.com - My Blog
Can't wait to a more detailed review from you. Did you get any video of the ride operating?
Tom
Closed topic.