AlexInLA said:
The Lifthill got topped off today, great pictures @
http://www.themeparkreview.com/sfmmnew06/current.htm[/quote]Thanks! We did a little video too. As far as an opening day I have been told they are "shooting for spring break" which I think this year for the park starts March 18th. I think it's certainly possible the ride could be open by Solace, but that's a little optimistic.
There is still going to be a lot of landscaping that needs to be done after the steel is in place, and it's taken them about 2 weeks to get the lift installed and there's quite a bit left to go!
*** Edited 12/19/2005 8:16:27 AM UTC by mrbeanz***
You must be logged in to post