http://www.greatcoastersinterns.com/index.php *** Edited 1/24/2007 1:30:34 AM UTC by DragsterForce***
What you are working on is the finest wooden coaster train in the industry...no pressure... ;)
http://www.greatcoastersinterns.com/images/uploaded/22.jpg
And sorry if this had been published elsewhere, first time seeing it for me. ;)
I am sorry i don't mean to speculate but it is a little tempting. My thoughts behind this is, that since Renegade will run two MF and Toverlands coaster will be runing two, that just leaves two more trains and where would they be going is anybody's guess, but it will be intersesting to learn more about this as time goes on.
The site is great and is very informative. Evan and adam Congratulations and good luck to you both. I wish you all the best and enjoy the internship.
John
What that other location is is up to which rumor you believe (I've heard Hershey's Wildcat, Gwazi, or SOB). I personally believe that the extra two trains are for Hershey, since both Gwazi (4) and SOB (3) run more than two trains.
Bill
ಠ_ಠ
Are any of the trains you're building have an extra large chassis? ;)
Edit: It's pretty cool of GCI for letting you blog about your experience working there. It's something I never would've expected. Congrats on the job! *** Edited 1/24/2007 4:33:45 PM UTC by rOLLocOASt***
How often does Sonny RUN all three trains? Yeah.....so it IS still possible two of those are headed to Cincy. Seemingly unlikely at this point, but I don't think we can CONCLUDE yet that the trains are headed down Cocoa Ave. ;)
edit: Corey likes big butts....er, trains... :)
Hehe, "extra-large chassis"... ;)
*** Edited 1/24/2007 4:34:51 PM UTC by rollergator***
AV Matt
Long live the Big Bad Wolf
Modifications to the drawings? ;) ;)
AV Matt
Long live the Big Bad Wolf
You know the rest :)
*** Edited 1/24/2007 8:41:43 PM UTC by rOLLocOASt***
RatherGoodBear said:
How long does the internship last? Hopefully long enough so you get to field test a couple of your trains about an hour amd a half south of you. Have to get familiar with the company products, right? ;)
Well, the internship lasts until May, then I go back to Louisville for classes.
Acoustic Viscosity said:
Interesting passage:
"We're here because six trains is the most the company has ever had to build in one season and because modifications to the drawings have pushed back assembly to the point that at least a couple trains are typically done by this point (with less help)."Modifications to the drawings?
Nice catch, Matt. I read those words, but it didn't click. That definitely puts SOB back into the running (If you believe the rumors ;) )
Very possible that those 2 are going to SOB, and Wildcat either will wait until 2008, or *borrow* 2 trains from Lightning Racer.
I'm sticking with my original "Wildcat will have MFlyers by '08 opening day" statement....partly because it gives me an *out* if these two "bonus trains" DO end up going to HP... :)
I tend to not think SoB will get GCI trains... maybe that's where the Hurricane's G-Trains will end up? *** Edited 1/25/2007 3:13:59 PM UTC by Arson***
- Ryan - http://www.tideblue.com/painter/
You must be logged in to post