I wonder if they might cover the ground/gravel with mulch or something around the walkway. Just a suggestion, I hope that's not "too cedar fair" lol.
Does anyone know what kind of anti-rollback system this ride is going to have on the lifts? Can they use a standard one, or since the train won't be locked to the track will it need to be a horizontal lever system like on Leap The Dips?
Jim S. said:
Does anyone know what kind of anti-rollback system this ride is going to have on the lifts? Can they use a standard one, or since the train won't be locked to the track will it need to be a horizontal lever system like on Leap The Dips?
The Flying Turns I rode had a standard anti-rollback system. Clickety-clickety-click.
http://tmcgill1.photosite.com/KnoebelsGrovesJune30th2007/
Mostly of the new station and the initial helix, we've all seen the main trough before.
A couple of interesting things: They have taken the chassis from a two car train and pushed it up the main lift and sent it down. JUST the chassis, not the whole cars, and only two, not the normal 5 car train it is going to have. They were overall happy with the performance of the train but it did show them that some tweaking with the trains still needs to be done. Another interesting thing is going to be the transfer track. The last construction picture I have in the fading light is of a tree right next to the initial helix AND the road. This tree is staying. The transfer track will go out OVER THE ROAD.
Special thanks goes out to Coastin' Steve who told me to stop back at the end of the workday and he showed me around what you see in the pictures. The poor guy was exhausted since he got up at 3am to drive from Philadelphia to the site, and to John Fetterman who I had the fortune of spotting and he took some time to answer a few questions .
Tom
You have disturbed the forbidden temple, now-you-will-pay!!!
884 Coasters, 34 States, 7 Countries
http://www.rollercoasterfreak.com My YouTube
LdScotsman said:
They have taken the chassis from a two car train and pushed it up the main lift and sent it down. JUST the chassis, not the whole cars, and only two, not the normal 5 car train it is going to have. They were overall happy with the performance of the train but it did show them that some tweaking with the trains still needs to be done.
You must be logged in to post