Testing is on the way. Moosh, the control panel is already installed. Right now, all that has to be done is final testing of the hydraulics, and they then need to do a pull through (which will not take long [ maybe 2 days ] ). Testing should come within the next week or so.
------------------
Shaun Rajewski
CoasterLine
http://www.coasterline.com
*** This post was edited by Rctycoon2k 3/11/2003 10:23:12 PM ***