Posted
Knott's Berry Farm's Xcelerator modification continues as cables have been attached between the towers and the ground. A crossbeam is on site and appears to fit between the towers. Meanwhile, red car bodies will cover one of the trains. GR8 SK8's control panel has been installed while Camp Snoopy's theater takes shape.
Link: America Coasters Network