Posted
Six Flags Great Adventure announced a 23.5-megawatt solar project, with 60,000 panels, that will power almost all park operations this year and be the largest “net metered” solar project in New Jersey. Net metered means a solar installation can return power to the electric grid when panels produce more than needed.
Read more from The Philadelphia Inquirer.