SFMW Online adds new photos of Marine World construction

Posted | Contributed by Brian Grapes

On April 21, 2001, I was able to make a trip out to Six Flags Marine World to check out the construction of V2: Vertical Velocity. I am excited to report that several of the very large supports for the two spikes have been erected. It looks like they have installed most of the track for the station as well. There were a few other pieces laying around in the construction site.

Link: SFMW Online

Comments: 6

Loading...