Phantom's Revenge track installation complete

Posted | Contributed by cernelli

All of the track on Phantom's Revenge has finally been installed! There is a lot of welding taking place to get the ride ready for testing. A few supports still need to be erected and there is a small gap between the end of the Morgan track and the beginning of the Arrow track at the brakes. The layout at the end of the ride looks great with some nice bunny hops and an entrenched turnaround that gets extremely close to the ground. Construction's going well and the Phantom should have his revenge on us very soon!

Link: Kennywood Boulevard

Related parks

Comments: 3

Loading...