Posted | Contributed by cernelli
All of the track on Phantom's Revenge has finally been installed! There is a lot of welding taking place to get the ride ready for testing. A few supports still need to be erected and there is a small gap between the end of the Morgan track and the beginning of the Arrow track at the brakes. The layout at the end of the ride looks great with some nice bunny hops and an entrenched turnaround that gets extremely close to the ground. Construction's going well and the Phantom should have his revenge on us very soon!
Link: Kennywood Boulevard
Okay, say it with me, "Most under-anticipated roller coaster of 2001." This ride looks absolutely awesome!
The ride looks great, but I'd still like to see the tunnel they advertised. That would be really cool if they have that. Also, I'm probably going to Kennywood in a week when that ride won't yet be open, so I'll have to wait till summer.
Oh my God! I need to get on this ride. themeparkne, I'll say it with you. Most under-anticipated roller coaster of 2001 :)!
-------------
Life is like a coaster---
You go up, down, turn-around, and upside-down...and then there's all that pressure on your head, too...