Posted
With temperatures barely exceeding thirty degrees throughout the past two weeks, construction workers continued their fast-paced effort to get Superman: Ultimate Flight up and running. The lift hill and drop are totally complete and the pretzel loop is starting to take shape. Many track pieces are on site waiting to be assembled.
Link: The Great Adventure Source