Posted
With temperatures barely exceeding thirty degrees throughout the past two weeks, construction workers continued their fast-paced effort to get Superman: Ultimate Flight up and running. The lift hill and drop are totally complete and the pretzel loop is starting to take shape. Many track pieces are on site waiting to be assembled.
Link: The Great Adventure Source
It certainly took them long enough to get this far...
You'd think they would have started construction in the fall when the weather was still relatively nice.
-----------------
Be polite and ignore the idiots. - rollergator
You must be this dumb to ride Viper. -SFGAdv.
-----------------
-----------------
Coming in 2003-The Spawn Of Magnum!
A few other B&M's haven't made their opening day deadline. Whether or not they were intending to make it is something I am unsure of though.
Intamin Fan-
Scream at SFMM is going in the parking lot and so is parts of SUF at SFGAm. It must be some new trend that SF came up with.
-------------
James Draeger
-Captain Sarcasm (aka Sour Boy)
*** This post was edited by Draegs on 1/23/2003. ***
Draegs - What trend? They've had quite a few notable "parking lot" coasters built in the past.
- Colossus (SFMM)
- ShockWave (SFGAm)
- Medusa (SFMW)
- Déjà Vu (SFoG)
- Roar! (SFMW)
- Zonga (SFMW)
-----------------
The top 3 all time cobrarolls.
1)Raptor's
2)Deja Vu's (times 3)
3)Batman Knight Flight's
If it ain't broken, don't fix it.
Is this new opening date confirmed?
I'm going on my Senior trip and we will be hitting SFGAdv. on opening day. I was really looking forward to riding this B&M masterpiece.
-----------------
You must be logged in to post