For anyone who wants to know about one train operation I wor the ride. The State has only inspected and cleared us for one train. Each trian must be cleared bafore it can be used. Theres a lot of computer programing involve w/ each train thats why its taking so long. However the state is coming to inspect later in the week, and clear us for two train operation. With the 3rd being worked on right now it shouldnt be long before 3 train operation.
-------------
Don't mess with the X in 01