Wicked Cyclone nearly complete at Six Flags New England

Posted | Contributed by Jeff

Workers from the Rocky Mountain Construction Co. continue work on the new hybrid roller coaster, the Wicked Cyclone, at Six Flags New England.

Read more and see construction photos from The Republican.

Related parks

Jeff's avatar

Here's another article, with MOAR PIKSHURS!

http://www.bostonglobe.com/business/2015/04/27/six-flags-updates-cy...story.html


Jeff - Editor - CoasterBuzz.com - My Blog

CarolinaNick15 said:

I thought about it and there's two track pieces per section of track on an rmc so that makes sense. But I think TC should have opened before a ride that was built in a blizzard.

Both rides are being built by the same company in sort of a split squad, and both have had their challenges (TC had to deal with a major fire and lift hill rebuild).

delan said:

Great - atleast ther eis not too much delay. Better than those infidels at Magic Mountain who have pushed Twisted Colossus to Summer of 2015.

I bring this up on almost every California construction thread, but Summer Season here starts in mid-June. Not Memorial Day like the rest of the country. In fact, it's shocking to many (including some of the imagineering/creative team) that all of the Disneyland 60th anniversary stuff is starting mid-May, rather than mid-June.

No one should have expected TC to open in May, even prior to the fire.

Last edited by CreditWh0re,
Raven-Phile's avatar

At first, I thought the structure was all steel, but then I realized they painted it gray before they put it up. The guy power washing the paint off the old stuff gave that away in the article.

Is the 1st overbank turn the same as the original riverside cyclone? I remember you could see remnants of it throughout it's days after six flags modified it.


1.SV 2.El Toro 3.MF 4.I-305 5.Kumba
6.STR@SFNE 7.Voyage 8.X2 9.Storm Chaser 10. Wicked Cyclone

CreditWh0re said:

delan said:

Great - atleast ther eis not too much delay. Better than those infidels at Magic Mountain who have pushed Twisted Colossus to Summer of 2015.

I bring this up on almost every California construction thread, but Summer Season here starts in mid-June. Not Memorial Day like the rest of the country. In fact, it's shocking to many (including some of the imagineering/creative team) that all of the Disneyland 60th anniversary stuff is starting mid-May, rather than mid-June.

No one should have expected TC to open in May, even prior to the fire.

Except, Twisted Colossus is opening in May.

Eric Hossfield said:
Is the 1st overbank turn the same as the original riverside cyclone? I remember you could see remnants of it throughout it's days after six flags modified it.

No, nowhere close.

John Knotts said:

CreditWh0re said:

No one should have expected TC to open in May, even prior to the fire.

Except, Twisted Colossus is opening in May.

Yeah, just saw that it's set to open May 23rd. I don't think anyone expected that. (cue the Spanish Inquisition graphic)