Posted
Vertical construction on the new Superman themed flying coaster at Six Flags Great Adventure has finally begun. Supports for the loading station were the first things to rise. Most of the track has arrived and is on site ready to be installed. A complete update has been added to Great Adventure Source.
Link: The Great Adventure Source
I have also heard that Evolution is a puke inducing machine. Maybe it's a good thing I haven't ridden it. I would guess the ride cost Six Flags an easy $1 million to $2 million dollars. What a waste.
-------------
2003-Gotham City @ SFA presenting Bathroom the Ride-Please remain seated at all times
*** This post was edited by Intamin Fan on 12/6/2002. ***
-----------------
Is that a Q-bot in your pocket or are you just happy to see me?
-----------------
Take a Virtual Ride:
http://badnitrus.coasterbuzz.com
Mike "Viper" Semtak
Viper, I too WAS guilty of believing it would have dual stations (probably because *I* wanted it to, lol). I have since been *set straight*, but still think it SHOULD have been dual stations. Of course, I'm also one of the doubters who thought WT's capacity would be a problem. I know it sure would've been if these were Vekomas, they were MUCH harder to load. The Beemers load *almost* as easily as the inverteds...
But if they don't want to believe that you *know*, let them believe what they will....Keep that badnitrus stuff coming, it's AMAZING....:)
You must be logged in to post