-----------------
BMCOASTER
bmcoaster@wi.rr.com
-----------------
"My friend who works there said.." In enthusiast talk is,"The Lemon Chill guy said.."
-----------------
Sig under construction - announcement coming soon!
-----------------
87 different coasters for this year and counting... 149 total!
'Gator - none of Shockwave is headed to SFKK. Anyone who wants to ride this Arrow coaster will have to make trips to the Houston and Baltimore/Washington areas next year.
Moosh
-----------------
Sig under construction - big announcement coming soon!
Mamoosh said:
'Gator - none of Shockwave is headed to SFKK. Anyone who wants to ride this Arrow coaster will have to make trips to the Houston and Baltimore/Washington areas next year.
Yes they will be cutting the ride in half, one part will go to Houston, the other to DC/B. :) So in order to get the track credit you will have to ride both halfs.
-----------------
Swoosh get's it. Hey Swoosh...I'm still waiting for us to form our comedy team - Swoosh & Moosh! You gotta be the straight man, tho. LOL.
Moosh
-----------------
Sig under construction - big announcement coming soon!
Mamoosh said:
Anyone who wants to ride this Arrow coaster will have to make trips to the Houston and Baltimore/Washington areas next year.
Sounds like SFA will make a great CoasterCon sidetrip this summer. I'd be 'Shocked' if the majority of attendees don't make it!
Bassistist and I are already planning a side trip there next year. I just think its so cool that one coaster will eventually generate three credits to a person's track record.
Moosh
PS - goons, Gator...goons!
-----------------
Sig under construction - big announcement coming soon!
Man, 'Spread it Around' is such an impressive program. I think it will revolutionaize the industry.
Kudos to Six Flags! Credit whores rejoice!
-----------------
"Tell everybody waitin' for a Superman that they should try to hold on best they can." - The Flaming Lips "Waitin' for a Superman"
*** This post was edited by chris on 10/15/2002. ***
actually i heard that everything upto the MCBR is going to Houston the MCBR and after is going to washington. THe difficult part is lining up the the launching rise to he brake run in houston exactly to land you in washington on the brake run ;)
-----------------
Sig under construction - big announcement coming soon!
So, assuming calvin12 is correct, the Houston ride is actually going to END with a nice headbanging....the MCBR finale....
"Arrow Dynamics....the more things change, the more things stay the same"...;)
-----------------
"Cornwallis, swim for your life or you're gonna get caught in the whirlpool."
I have ridden the future, and it's name is......X!
Yes, gator. A 'Wave of Mutilation,' so to speak.
But I think SF will invest some of the cash they're ultimately going to save into some ride modifications to make the experience more enjoyable.
-----------------
"Tell everybody waitin' for a Superman that they should try to hold on best they can." - The Flaming Lips "Waitin' for a Superman"
'Gator - Shockwave is not being split exactly in half. As I said before, one coaster will be the second two loops and the corks, the other will be the first loop and the boomerang. What I wasn't able to say until now is that Arrow, due to the whole X debacle, is actually helping with this project and manufactuing a few new pieces of track so it all fits together. The MCBR will probably be used as a final brake run on one of the coasters, but I'm not sure which one.
Moosh
-----------------
Sig under construction - big announcement coming soon!
You must be logged in to post