Baddboy: Have you EVER seen Colossus running both sides? The last time I saw that was about 15 years ago. Last Saturday the Colossus line was by the Colossus Cookery all day long, and they were running 3 trains, on one side only. That is about par for the course on Colossus.
Riddler: 2 hours from the neon sign? No way!! Try 45 minutes. I waited 1 hour 15 minutes last Saturday and that was from WAY past that neon sign. (all the way back and around "The Climbing Wall") The slowest thing about Riddler's line are the dip-wads who fart around with the restraints.
No air conditioning in Superman? You must have hit it on a day when it was not working, usually it is downright COLD inside the queue. Superman's outdoor line will usually stretch all the way past the enterance to the Dragon Palace and start going down the hill. THAT is a long wait, espically since thay usually run only one side at a time.
Hints: Most people flock to Goliath first, filling the queue quickly, so just wait till later for Big G.
First thing upon opening, take the Orient Express, (it is to the right of the merry-go-round) up to the top of the hill and hit Ninja and Superman first. Go down the hill and hit Riddler followed by Batman (this should take no more than an hour, I have done this pattern several times)
If Colossus has not backed up yet, then do that. Next double back to Psyclone. All remaining rides are the short lines or the fast movers. (coaster wise, anyway)
Even if the Goliath line is back to the "wooden sign shop" the wait is still only around an hour. The 3 train operation of Goliath keeps the line moving rather quiclky.
Of course, with the opening of Daja Vu and later, X, the flow of people will change quite a bit.
-------------
"X" marks the spot in 2001!