DWeaver said:
Vertical construction began today.....
How do you know that? What kind of vert. construction? Track? Anyways, this coaster is really short and unless they have major problems on their hands w/ the hydraulic system. Other then that it's almost a guaranteed on-time opeing.
-----------------
SFNE drops the "floor" on SFNE for 2002! Visit www.geocities.com/sfneguy for info. and pics of SFNE, including NEW constr. pics of B:DK!!! Formerly known as srosatsfne. I am NOT SFNEFreak!
It will be open on time, providing that the hydraulic launch works as it is intended to. Yes of course they have tested it, but what does that mean when you put the ride into the real world. Look at X, they were pretty sure that they had it figured out, but there were certainly some adjustments that had to be made.
I have faith in Cedar Fair that everything will go as planned.
And by the way, track and suppourts vertical construction started today.
-----------------
Xcelerator-
0-82 in 2.3 seconds! =Wow!
-----------------
I've traded in my 2000 Giovanola for a 2002 Arrow X4D :)
My other car is now an Arrow X4D!
Maybe, maybe not. First let me say that I love Intamin rides, but they seem to have problems with their prototypes. Look at S:TE, V:TBC, Perilous Plunge, just to name a few. If it were a standard hyper or something, I'd say yes like everyone else. But it's a something new for Intamin, and now with all of Hypersonic's problems, who knows exactly when this thing will open.
But Ghostrider will definitely be blazing the rails in July, that alone is worth the price of admission!
*** This post was edited by Speedy on 4/25/2002. ***
You must be logged in to post
