-------------
http://www.islandguide.8m.com
all about PKI
the Beasts` Den
-------------
http://www.islandguide.8m.com
all about PKI
the Beasts` Den
"Ride is capable of operating with up to four (4) 36-passenger trains, and/or the additions of a seventh 6-passenger car per train."
You can view that very same quote from here:
http://www.rcca.com/rides.html
Hmm, I would assume that you could run 3 trains on it because it states that SOB can run up to 4. Do they have a 4th train on site or even the extra cars? From what I understand, there is only 3 trains and I guess they could get a 4th one and extra cars if needed.
-----------------
http://sapman.homestead.com --- My stupid website
*** This post was edited by gatorwoodie on 8/29/2001. ***
Also, I've noticed that the trains tend to overshoot the brake run onto the transfer if the mid-course trims are light. Block violations can be a problem, that is if the transfer is it's own block.
-----------------
Scott W. Short
mailto:scott@midwestcoastercentral.com
http://www.midwestcoastercentral.com
Chris Rettig said:
It's not big enough. The block run has a tire system to get the train up to speed to make the loop, if it does get stopped for some reason. It essentially acts like a launch.
They should start using this as part of the normal ride operation. I think this would greatly increase SOB's popularity. If they put a tunnel over it, even better.
-djansi
You must be logged in to post
