On aug. 1, giant drop opened to the public after some fixin with the ride. i saw a fork lift workin on the ride, i saw them messin around with the wires/cables on it then about 5 mins after that, i saw the ride operate, and for about 20-30 mins of testing they opened the ride to the public. I believe i saw only two carages (sp) not working. I also saw them workin on deja vu breaks. nothin new