Posted
Groundwork on Scream! is progressing at a rapid rate, with several footers being prepared in the employee lot. Meanwhile, track and supports continue to arrive.
Also, the vehicle for Superman: The Escape's left side has returned with slight modifications. The left side of the twin-tracked ride is expected to reopen shortly.
Link: America Coasters Network