Posted
Arrow Dynamics was chosen for the engineering and manufacturing of the Olympic cauldron for the winter games this year in Salt Lake City. While the design and look was established by another firm, the engineering and manufacturing took Arrow 18 months to complete.
Read more from the official Salt Lake 2002 site.