Posted
City officials say the construction project now is expected to cost $3.5 million, up from the original $3 million estimate. Schmitt said $300,000 in city reserves have been tapped, and he believes private donations will cover the rest of the deficit.
Read more from The Green Bay Press Gazette.
BBSpeed26 said:
Pay no mind to the boost in profile and attendance at Beech Bend
I won't. They've already got a classic woodie in Kentucky Rumbler. Who needs the Pippin? ;)
The amusement park rises bold and stark..kids are huddled on the beach in a mist
http://support.gktw.org/site/TR/CoastingForKids/General?px=1248054&...fr_id=1372
^That was partly where I was going with my arguments about "longer lines for other adjacent rides" (turns out, after visiting, all the rides at Bay Beach are what I'd call "nearby", LOL). I never visited before Zippin Pippin, but I'd have a REALLY hard time believing the second dirt parking lot was ever utilized, much less full, before ZP came along.
Money pouring in from everywhere - the hallmark of a successful wooden coaster (ask Dollywood).
You must be logged in to post