Posted
Construction just keeps on chugging along. In the past week the X-Flight crew has completed the loop. Only one high section of track remains: the horseshoe turn. After the turn that connects the first drop to the loop approach is done, all that remains is the turn over the lift, the barrel roll, helix, brakes and station; basically the low portions.
Link: Midwest Coaster Central
You must be logged in to post