With the new operateing system how many trains can

With the new operateing system how many trains can be run at the same time on Cedar Creek Mine Ride?
Used to be five, I think now it's two or three. You can check over at GTTP...

-------------
Po!nt of View: A different look at Roller Coasters.
http://www.crosswinds.net/~justmayntz/thrills/
I understand the new system is designed for three. Station brake, lift #1, lift #2, safety brake...that's only four blocks, which means only three trains. With the old system you could add the two mid-course block brakes for six blocks which is enough to run five trains. But those brakes (and their associated anti-rollback strips: CLUNK-CLUNK.....CLUNK-CLUNK) are now gone.

--Dave Althoff, Jr.

You must be logged in to post

POP Forums - ©2024, POP World Media, LLC
Loading...