In a recent drive by, Superman Ultimate Escape has most of the support columns in place. There are only 4 pieces of red Intamin track in the parking lot currently. I can't see this taking too long to put up....... however with all of the LIM troubles that plagued Volcano at PKD and other LIM rides, I hope they try to get everything right before opening day.
Batman has started vertical construction, as the final brake run, part of the lift, and what appeared to be the mid-course brake are in place. The mid-course is located pretty high off the ground and is almost at the same level as Serial Thriller's rollover element.
Villain's lift appears to be at its highest point (which does not look like the "120 feet" Premier is claiming) and should come together nicely. Whether or not everything else (Shipwreck Falls, Boomtown, the new tube waterslide) is up is debatable.
As always- I have no pix....... so don't ask!
ray p.