Posted
From the video description:
Two key milestones have been reached! One train has been placed on the track and is now being prepared for initial testing. But the BIG NEWS: the new spike tower is now complete!
Very cool. We were there for Halloweekends and it was striking to see the rear spike from Rougarou's lift hill, halfway built. It reminded me of seeing the original TTD tower halfway built during Halloweekends, 2002.
Chris Baker
www.linkedin.com/in/chrisabaker
Man, that "CP" logo just can't not look like "DP" to me.
Same.
Most of the ride was already built, but they are talking about testing before Xmas, is this the quickest a CP construction project has been done? also surprised how quickly the repaint went once the season closed.
Foreshadowing about the park it will get moved to eventually.
Jeff - Editor - CoasterBuzz.com - My Blog
I really hope they checked each bulb on the xmas tree lights before they hoisted it up there.
Promoter of fog.
It would have been cheaper to make the rear spike half as tall if they'd installed a giant spring bumper at the end. ;)
Side tangent, now that Power Tower is finally getting painted, can we rethink the orange columns on Iron Dragon?
Like the same teal as the trains with red track.
Ugh, Iron Dragon is just awful in its current color scheme and will look even worse now next to the colors of TT2. The original color was 100% better.
Testing already?! Looked like it on FB. Maybe they can open on New Years Day. ;)