Titan almost complete, trains on the track

Posted | Contributed by Lone Star Thrills

I've added 40 new Titan photos. Mid course brake run is complete and they have started tracking the last half. Also one Titan train is sitting on the tranfer track and two more are in the storage shed.

Link: Lone Star Thrills

Related parks

I wonder if they didnt anticipate it flooding that badly and didn't design a drain into the layout in the trench, or if they did put a drain in there and
A. It's too small to handle the capacity of rain thats fallen as of late
B. It's sump-pumps aren't connected yet (that is, it it has pumps at all)
etc.