-----------------
"It's A Hip Hop HOllercoaster."
-Ludacris
-----------------
Six Flags Magic Mountain is the place to be for top notch thrills in 2002! X is the ultimate thrill machine!
*** This post was edited by GoldRusheROCKS on 11/30/2001. ***
When your park is young, hire 1 for every 3 or 4 rides except the hedge maze. Hedge mazes never break down, so set the inspection time to never. Everything else should be 10 minutes. Make sure the patrol routes can access the exit without as few obstacles as possible (ie. dead ends, intersections, etc...) When your park starts raking in money late on, don't worry about the 1:3 or 1:4 ratio, go all out, make it a 1:1 ratio. At that point, you might want to take some of your 1:4 ratio mechanics and have them go down to 1:1 and hire new ones for the rides the old one no longer covers.
It's always worked for me. BTW, they don't get "lazy." I have no clue where he got that idea from. They work just as hard as always, just as your park grows, the more intersections there probably will be (due to more food stalls, midway branches, etc...) making them take a wrong turn here or there. Firing them won't help.
-----------------
Hi! I'm Hungry, whats your name?
"guest 1376 is lost and can't find the exit"
-----------------
~What do chickens think we taste like?~
You must be logged in to post