I was there on Tuesday June 25. I was waiting in line for the back of S: RoS and I obviously saw the red train, with dummies filling the first 3 cars, on the transfer track. I asked the operator back there that dispatches the train when we can see the red train operating. He said they were talking about sometime next week but then he said that could mean a month. At the rate they're going it could well be a month before we see the red train operating.
I waited about an hour both times I rode it on Tuesday. If the red train was working it would only be a 30 minute wait. It kills me to think of it.
-----------------
TOP 5
1. Alpengeist, 2. Magnum XL-200, 3. Superman: Ride of Steel (SFNE), 4. Volcano: The Blast Coaster, 5. Apollo's Chariot
Close Calls 1. Grizzly (PKD), 2. Batwing, 3. Montu
-----------------
Im the #1 Canobie Lake Park Fan!!!These are my top 3 coasters:
1. S:RoS @ SFNE 2. Yankee Cannonball 3. Cyclone
You must be logged in to post