FYI, according to Jodi, the So Cal ACE rep, Scream cycled for the first time yesterday. I'm sure some of the local sites will have pics soon. April 12th opening is still scheduled.

------------------
"Everybody loves Moosh!" - Dawnmarie313

Geeez. They really constructed this thing at lightning speed.

------------------
Arena football has arrived in the Windy City. Go "Chicago Rush"

I thnk Valleyfair needs a 7-invert floorless......... It could happen

------------------
Big D from the A to the N drop da O

janfrederick's avatar
Anybody gonna be there on the 13th? My plans changed. I might be able to swing the 12th though. I can't wait!!! I've never been on a floorless.

------------------
"Know thyself!"

Mamoosh's avatar
jf - Since I am not going to the media preview day I plan on riding the coaster on either the 12th or 13th, but haven't decided which day. I could be persuaded to wait until the 13th if you or someone else wants to meet up.

------------------
"Everybody loves Moosh!" - Dawnmarie313

Doesn't surprise me.. The Consign AG guy arrived on the 17th.

------------------
June 11th, 2001 - Gemini 100
VertiGo Rides - 82
Technical Services - 2002-2003
Frightzone Screamster - 2002-2003

nasai's avatar
JF, you will love it! Great ride, top to bottom, with excellent pacing. Good eating! :)
------------------
Saddam Hussein - the new single - click here for the drama

DaNo said:
I thnk Valleyfair needs a 7-invert floorless......... It could happen

------------------
Big D from the A to the N drop da O


Right on! I fully agree! SV will be OK though,

Anyways.. Scream sure did go up fast! I can't beleive its already testing! Maybe there are some videos somwhere.....
*** This post was edited by Montu001 3/25/2003 3:44:42 PM ***

Woot! I might have to go check it out this weekend if I get the chance.

If I end up there on the same day to ride it for the first time as some of the rest of you, hopefully I'll run into some of you lot :)

I don't think theyre will be any photos/video till this weekend. Ops begin training this weekend (I Burn Churros is on opening crew!), and if all pans out, I should be riding it next Thursday! :):):)
SFMM already has a bazillion coasters.... I think LeSourdsville Lake should have gotten this. ;)

------------------
A day is a drop of water in the ocean of eternity. A week is seven drops.

Any pics with it testing yet?

------------------
Six Flags Worlds of Adventure Online

SFMM sure did do the opposite of what Cedar Point did this year (not saying this is abad thing, just an observation). SFMM put a ride lighning quick while CP starting building in the middle of last season!

------------------
"Jessica, you're turning me into a criminal, when all I want to be is a petty thug." -Bart Simpson

Mamoosh's avatar
Craig - CP also has to contend with Ohio weather and testing/finetuning Dragster once it's built. Because Scream is not new technology and So Cal has relatively good weather it takes less time to construct, test, and open a coaster.

------------------
"Everybody loves Moosh!" - Dawnmarie313

It just goes to show that CP is building for the future! They were thinking well in advance for that coaster!
------------------
--------------------
www.answersingenesis.org
Mamoosh's avatar
And no other parks plan in advance? Give me a *freakin* break here. Stop putting CP on a pedastal simply because they started construction on a 420' coaster earlier than SFMM began a 150' coaster. It has nothing to do with "planning for the future." It has everything to do with the scope of the Dragster project and the cold Ohio winter.

Moosh

------------------
"Everybody loves Moosh!" - Dawnmarie313


*** This post was edited by Mamoosh 3/25/2003 6:14:37 PM ***

The park doesn't start daily operation till the 29th, so you won't see any photos until the weekend.

-Jeff

http://americacoasters.com

I guess I was referring to the comments in the most recent diary entry. Rob Decker did say, "[t]he era of executing the design and construction for major rides from season’s close to season's opening is over". I know he was referring to seasonal parks and all, but I just found it interesting that CP is kind of straying from the norm of quickly building a coaster much like SFMM is now.

Anyways, to get back on topic, I'm happy to see another absolutely gorgeous B&M coaster go up.
------------------
"Don't you hate pants?" -Homer Simpson
*** This post was edited by Craig the Coaster Freak 3/25/2003 6:42:52 PM ***

ApolloAndy's avatar
Nobody builds and tests a coaster on the scope in TTD in the time it took MM to build Scream! If MM was going to build a "strata" they'd have started a long time ago as well. And if CP were to put in a Medusa clone, they would've thrown it up in a few months, just like MM (a little slower for weather...). Is there a shortage on common sense?

------------------
Be polite and ignore the idiots. - rollergator
"faster, cheaper, and more often" that's somebody's new sig -UpsideDawnGrrrl
My shirt in my photo seems to be for "Aging Bull"
*** This post was edited by ApolloAndy 3/25/2003 7:00:51 PM ***

Dang Andy...so testy today :) Anyway it is written in the great scrolls that the almighty CP must laud over MM at all times.

------------------
Party goin on in the corner.....gotta be California!
*** This post was edited by Antuan 3/25/2003 7:33:59 PM ***

You must be logged in to post

POP Forums - ©2024, POP World Media, LLC
Loading...