However I look back on this now and realize that I never brought up the Turn-of-the-Century being redone into the Demon as an example.
Besides the Demon and Phantoms Revenge, what other steel coasters have been redone for a totally different ride experience. I am referring to just the track layout being changed and not the trains.
-----------------
""An hour wait for a 2 minute thrill. Yes, we need our heads examined""
-------------
Jeff Tobe
tobejeff@pilot.msu.edu
I'd also LOVE to see them take the Beast and make it longer :) Not gonna happen, but would ROCK.
-Josh
-----------------
-*as seen on a sign at PKI:
All packages are subject to search
No weapons or illegal substances may be brought into the park.
Sorry for the inconveinience.*-
Tolian said:
lol, here;s an idea, rip down drachen fire totally! get rid of the succker! redo the station, and then get B&M to rebuild the coaster same design, elemts and everything but obviously fix the transitions and all that but keep it as close to the original as possible and reopen it the next year with a better access path and 4 wide seating and a lot of the gp woul dhave no clue it was an entirly new ride and just think at best it was "fixed" that way BGW can hold onto the all the theming and not have to worry about coming up with a new name and all that. do it quietly over the off season. ok yeah it IS a bit excesive but the lay out is great looking and I think if it;s transitiosn were fixed and better trains it could work wonders.
Yeah, I think that would be a sensational idea, but if BGW isn't willing to just install new stinkin' trains, I highly doubt they'll destroy and rebuilt an exact replica using the most expensive company to do it. Guess we can wish/hope.
-----------------
I rode "X" and never went upside down.
You must be logged in to post