just a little update on nemesis inferno for you as there doesnt seem to be any on here for a while. testing is due to start tomorrow (wednesday) but it could be pushed back to thursday. many websites have said that they are going to get videos and pics which i will give you all links to when they become avaliable. the latest batch of pictures were from november 25th if you are intrested:
http://www.extremerides.co.uk/construction/calypso/251102/index.html
-----------------
Nemesis Inferno - The Pressure is Building!
That's lookin' really cool. The theming looks like it will actually be okay and the coaster will be awsome as usual.
-Rocky, who is praying for that trip overseas next year.
-----------------
I talked with the Dippin' Dots guy and he assured me that Cedar Point was to get that 10-inversion terra-woodie-invert-stand-up because Magnum is sinking. The current construction is for the new super-Dippin' Dots stall he is to run.
-----------------
Im the #1 Canobie Lake Park Fan!!!These are my top 3 coasters:
1. S:RoS @ SFNE 2. Yankee Cannonball 3. Cyclone/B:TDK
Yeah, too bad they are just gonna make a half volcano but it's better than nothing. The volcano theming at the front do look really cool. But the volcano at Tokyo Disney Sea is still the best one i've seen, it's a tough one to beat :-).
I'm most curious about how it'll look inside the tunnel.
Just a question, does B&M make any pull trough with a car or something or is it just Intamin that does that?
-----------------
Nemesis Inferno - The Pressure is Building!
NO, but the station is the volcano.
Moosh
-----------------
Coaster & Amusement Park Christmas cards available here. NOW ACCEPTING PAYPAL! We ship Priority mail -- Order today and receive your cards in 3 business days!
Thanks for the update :)
I still love that turn out of the station (or volcano)
-----------------
--Dingo 65--
http://rct.ogresnet.com
Forgotten member of Thrillride forums.
-----------------
Nemesis Inferno - The Pressure is Building!
ohhhh, look at these lovely pictures:
http://www.extremerides.co.uk/construction/calypso/061202/index.html
if you are wondering where the wheel cover is for the first carriage, its been sent away to tussauds studios to be themed
-----------------
Nemesis Inferno - The Pressure is Building!
-----------------
I was asked to describe X in one word. The word? -- OhmygoshwhathaveIgottenmyselfintothisisthescariest
thingintheworldhelpmeIamgoingtodieAHHHH!!!
-Nate
coasterdude318 said:
I was under the impression that "Nemesis" was only being used to promote the ride and it would be dropped when the ride opened. I don't know if that's going to happen or not, but I'm sure hoping it does.-Nate
The official statement was that "Nemesis" was just a prefix so the GP would know what kind of ride Inferno was going to be, because Nemesis is well-known in England. Doubts are beginning to surface now, because the park is still calling the ride Nemesis Inferno.
I still don't see what the Nemesis prefix has got to do with the ride. I can link a volcano with the word Inferno, but Nemesis and volcano?
-----------------
Dutch Coastin' :: European coasters, thrills and theming!
a little note here if you wanted to know, infernos track is silenced
i am also expecting more pictures of testing to be uploaded tomorrow sometime, so i will give you all a link then
-----------------
Nemesis Inferno - The Pressure is Building!
Here's the video of the testing. You think it's fast enough ;-)
You must be logged in to post