Posted
Since the $25 million Top Thrill Dragster's May 4 opening at Cedar Point amusement park, it has been shut down several times to accommodate a fickle, prototypical hydraulic system required to launch the ride out of its berth. Consultants say the problems associated with a prototypical ride of this magnitude are to be expected.
Read more from The Toledo Blade.
and i hve the theory.
all of these rides are made because of a dream.
the guys at Alton Towers did'nt go up to John Waldrey and go "we want a flying coaster" it was quite the reverse. stengel thought of the vertical loop in bed (in a dream!!!) they're all the same they are ideas not requirements and need refining
pay attention to england they have the same problems in our 4 theme parks as you have in your 5 million or whatever it is*** This post was edited by Decimator 8/17/2003 10:51:59 AM ***
So, let's keep perspective. I travelled ten hours to get there, and was not disappointed. It's not as bad as these posts would indicate.
You must be logged in to post