Posted | Contributed by xbombman
The boomerang of Deja Vu at Six Flags Magic Mountain is now complete. With two cranes working on-site, construction is flying by at a very fast pace.
Track and supports for X continue to arrive. Landwork also continues in the bus parking lot, and more and more footers are being prepared.
[In addition to the photos on ACN, check the photos on Twisted Rails.]
Link: America Coasters Network
Why is it that Six Flags doesn't like to remove sections of parking lot for construction? I'm not looking for any elaborate landscaping, grass would be fine. Shockwave at SFGAm, Medusa West, part of Titan and now X are all like this. It's just kind of ugly.
-------------
Jeff
Webmaster/Admin - CoasterBuzz.com
Jeez! Everyone was right! That WAS fast!
The are really picking up speed! Keep it up SFMM!
-------------
Drachen Fire, Will it be swimming with the fishies?
Looking good! Hope the ride is going by late April. What are the odds?
Every Deja Vu has been going along smoothly. SFGAm's will probably be open by May 5th.
By the way, if I remember correctly, Raging Bull at Great Americaused some of the parking lot. They just covered it with rocks.
-------------
WOW! It's just like "Speed 2", only it's a bus instead of a boat!
*** This post was edited by rct_2000 on 4/9/2001. ***
WOW! Deja Vu just keeps looking better and better by the day! Hopefully, it will open around Memorial Day or someday in May.