If I was in carge of the coaster this is what I would do...
First off, theme it to drag racing or something like that since that spot has always had a racing ride (that I know of). Secondly, the ride would have stadium seating and have 8 cars with a total of 4 trains (just incase 1 or 2 are being worked on ;)) The ride would start out by taking a 45 degree turn towards Perilous Plunge. It would then completely stop for about 10 seconds then get launched up a 90 degree hill... you know what? This sounds familar. ust do something like TA2K. ;) That'll work.
-----------------
Joke Of The Day:
Two Peanuts Were Walking Down The Street; One Was A Salted.
themonkeymaster99 said:
erm, i doubt it will have a "t" bar *cough* parilous plunge, and you insane if you think it will take 3 months to build a coaster, insane i say...
*** This post was edited by themonkeymaster99 on 11/24/2001. ***
Insane huh? Tell me how long it took to make and complete Riddlers Revenge? 3 months!
CoasterFanMatt said:
"It doesn't matter which company designs the ride, any of them can have delays.
So Intamin's more reliable than Arrow and Vekoma?
Consider Superman: The Escape.
Same situations.. super delays!-------------
Knotts 2002...ready when you are!"
-------------
Knotts 2002...ready when you are!
*** This post was edited by CoasterFanMatt on 11/26/2001. ***
You must be logged in to post
