AV Matt
Long live the Big Bad Wolf
Timberrrr Tower should be ready to fall when the park opens.
Additionally, on Monday, March 20, 2006, bridge demolition began on the SR 35 bridge over the Pigeon River overflow, at the Intersection of SR 35 (US 411/ 441) and SR 66 in downtown Sevierville. Motorists should be alert for lane closures, reduced lane widths, lane shifts and new conditions at and approaching this intersection from all directions. Motorists are advised to use extreme caution when traveling through this area.
For more information concerning these closures, visit Sevierville, Tennessee's website at www.seviervilletn.org . *** Edited 3/27/2006 7:16:21 PM UTC by gamndbndr***
Dollywood's coasters hardly ever have lines that go over a half hour, even when the park is packed. I think the longest I waited for Thunderhead was about a half hour tops, and that was the week it opened.
-Tina
You must be logged in to post