coasterfreak52 said:
"LOT OF PEOPLE ARE SAYING IT WONT OPEN TILL THE BEGINING OF JUNE. WHY IS THIS?"
BrandonR said:
Take a look at the speed they built Goliath vs. the speed they built Titan. Maybe it's a Californian thing, but they just do not seem to get in much of a hurry. It's taken them quite a while to even start building X.
Well that's BS. Goliath wasn't there one weekend I went, and practiclly done the next. Goliath was the second fastest coaster they have made so far I think. The Riddlers Revenge took less than 3 months TOTAL to finish and open. Californians DO NOT lack in the speed of building a coaster. Plus X has taken so long to start vertical construction because it's a F****N all new type of coaster that has never been built before. They have to make sure EVERYTHING is all right to build!