Deja Vu Construction


This sucks, When will Deja Vu open I think Six Flags Magic Mountain is lazy how long does it takes them to build a elevator lift 3 weeks?
-------------
"Enough is Enough"
After YOU build a multi-million dollar coaster, tell us how long it took YOU!

-------------
©Bruce's Posting Co.
Management said that Vekoma had trouble with Deja Vu's design. I said it before. It's not that hard to understand.

-------------

Let the bears pay the Bear Tax, I pay the Homer Tax.
Anyone who thinks Magic Mountain is "lazy" because of this does not know what they are talking about. Vekoma is the one having trouble with the ride...

-Jeff

http://americacoasters.com
There were some problem with the lift, but Vekoma have changed the design of the lift and problem has been solved. End June or Early July the coasters will open for public, the coasters needs many test rides, because this is a prototype (new trains and liftsystem.)
So. Who is running the park? If you have a problem, go finish it yourself. Delays are a part of life. If you can't live with it, kill yourself (ok, well don't do that. Just get over it.)

People should not complain. They should rejoice. They are taking a long time to make sure it is safe, and constructed correctly! Do you want to go on a incorectly built coaster, which will crash??? I doubt it!

-------------
Next up: Stupid human tricks! Followed by: Stupid pet tricks!
Why can that never happen? *** This post was edited by TrBiggar on 6/2/2001. ***
I think Vekoma is doing one heck of a job to get these coasters operating

They know they are on to something wonderful that will change the theme park industry forever. Of course there are going to be a few design bugs. It makes them work that much harder to make it a better ride.

Patience is a virtue

-------------
God Bless Coasters!!
http://www.jccn.org/religion/grace/Default.htm

You must be logged in to post

POP Forums - ©2025, POP World Media, LLC
Loading...