Cyclone Track Work Finished

The Cyclone construction has now finished the trck work on the ride.  All that remains is the station and platform work and of course a carriage.  Have a look at www.twistedrails.com and let me know what you think as your thoughts are now being noticed by the head engineer at Dreamworld.

P.S.  Give Karl a chance to get them up first though ok.
-----------------
"Thunder from Down Under"
The Croc Man Rules!!!

*** This post was edited by wayne "Thunder" currie on 11/10/2001. ***

Is it just me or did this thing go up pretty fast?

-------------
G.Bush:We will find those who did it, smoke them out of their holes, get them running, and bring them to justice.
I pray that I will never see a Six Flags Conneaut Lake

where is this being built?  Where was it last located?
It is being built at Dreamworld, and was removed from Luna Park Sydney, because noise complaints from local residents caused the closure of this park, and Dreamworld bought it. It used to be called Big Dipper at Luna Park.

And it did go up abnormally fast. I think Dreamworld wanted to get it in quickly, and so that left them lots of time to fix any problems with the mechanics of the ride well before opening to the pubilic in late December.


Richard

-----------------