I arrived at the park today, and I saw a huge crane next to chiller. So, I get in, do some investigating, and I see large Magnets being lifted up to the upper LIM segment. Not only that, but the Robin train (all 5 cars) were sitting, mid LIM on the primary streach. All throughout the day, the magnets on each side were hoisted down, and brand new ones (I saw large packaging boxes from lazertag) were brought up. I hope to see both sides open by the weekend.
-----------------
How much more floorless can they get?