Posted
Construction for Boomerang Bay's 2005 expansion is underway at Paramount's Great America. Lazy River construction is nearly complete and plumbing for the current system is being installed. The 150,000 gallon, heated Billabong Lagoon is also nearly complete. Parts have arrived for the new body slides, which include an enclosed slide and a vertical drop slide.
Invertigo has been painted, though it has retained the same color scheme.
Photos have been posted to ACN.
Link: America Coasters Network
I'm drawing blanks on everything....(The Big Green slide in the middle, btw.)
Im thinking a large flume ride, but I have no clue.
Thanks
Josh*** This post was edited by J Bird 1/8/2005 12:03:37 PM ****** This post was edited by J Bird 1/8/2005 12:04:06 PM ****** This post was edited by J Bird 1/8/2005 12:04:29 PM ***
*** This post was edited by J Bird 1/8/2005 12:04:55 PM ***
You must be logged in to post