Re: Chang track at SFGam.
Well, there are three other SF parls east of the Mississippi: GAm, GAdv, and SFNE.
From a logistic standpoint, I can see how they would put the parts on a barge and float them across the Great Lakes, them ship them by truck or rail to the final park.
If they shipped all by truck, they would need about 500 truckloads (I'm guessing).
For example: If Chang is headed to SFNE, and the parts are in Chicago, they can strap it to one train load (about 100 flatcars or covered gondolas) to the cloesest rail terminal, which would be either Albany, NY or Worcster (it rhymes with rooster), Mass. Due to the fact that either of those two terminals is about two hours away, one truck can haul 2-3 loads within one 12 hour day.
Coaster Junkie from NH
Long live the Yankee Cannoball!
All the world's a stage & I'm just here to build the sets.